China-Pakistan Economic Corridor's first hydropower project

Yekutanga hydropower yekudyara purojekiti yeChina-Pakistan Economic Corridor yakaiswa zvizere mukushanda kwekutengesa

Aerial maonero eKarot Hydropower Station muPakistan (yakapihwa neChina Three Gorges Corporation)

Aerial maonero eKarot Hydropower Station muPakistan (yakapihwa neChina Three Gorges Corporation)

Yekutanga hydropower yekudyara chirongwa muChina-Pakistan Economic Corridor, iyo inonyanya kuisirwa mari uye kugadzirwa neChina Three Gorges.

Corporation, iyo Karot Hydropower Station muPakistan yakaiswa zvizere mukushanda kwekutengeserana muna Chikumi 29.

Pamhemberero yekuzivisa kwekushanda kwakazara kwekutengesa kwehydropower station, Munawar Iqbal, director director wePakistan.

Private Electricity and Infrastructure Committee, yakataura kuti Three Gorges Corporation yakakunda matambudziko akadai sekukanganisa kwekorona itsva.

denda uye kubudirira kuzadzisa chinangwa chekushanda kwakazara kweKarot Hydropower Station.Pakistan inounza simba rakachena rinodiwa zvakanyanya.CTG zvakare

inoshingairira kuita basa rayo remubatanidzwa uye inopa rubatsiro rwekusimudzira nharaunda dzenzvimbo.Pachinzvimbo che

Hurumende yePakistan, akataura kutenda kwake kuThree Gorges Corporation.

Iqbal akati hurumende yePakistan icharamba ichizadzisa zvinangwa zvesimba rekubatana kweChina-Pakistan Economic Corridor uye.

kukurudzira kuvakwa kwekubatana kwe "Belt uye Road" kubatana.

Wu Shengliang, sachigaro weThree Gorges International Energy Investment Group Co., Ltd., akataura mukutaura kwake kuti Karot Hydropower.

Chiteshi ipurojekiti yakakosha yekudyidzana kwesimba uye chirongwa chakakosha che "Belt uye Road" chirongwa chinoitwa neChina-Pakistan Economic.

Corridor, inomiririra hushamwari hwesimbi pakati peChina nePakistan, uye kushanda kwayo kwakazara Ndiyo imwe chibereko chinobudirira musimba.

kuvakwa kweChina-Pakistan Economic Corridor.

Wu Shengliang akataura kuti Karot Hydropower Station ichapa Pakistan 3.2 bhiriyoni kWh yemagetsi akachipa uye akachena gore rega rega, musangano.

magetsi anodiwa nevanhu vanosvika miriyoni mashanu, uye achaita basa rakakosha mukuderedza kushomeka kwemagetsi ePakistan, kuvandudza chimiro chesimba.

uye kusimudzira budiriro yeupfumi inoendera mberi.

Iyo Karot Hydropower Station iri muKarot District, Punjab Province, Pakistan, uye ndiyo nhanho yechina yeJhelum River Cascade Hydropower.

Ronga.Basa racho rakatanga muna Kubvumbi 2015, nekudyara kwemari inosvika mabhiriyoni 1.74 emadhora ekuAmerica uye huwandu hwakaiswa hwe720,000 kilowatts.

Mushure mekunge chirongwa ichi chaitwa, chinotarisirwa kuchengetedza matani 1.4 miriyoni emarasha akajairwa uye kuderedza kubuda kwecarbon dioxide ne3.5 miriyoni.

matani gore negore.

 

 


Nguva yekutumira: Jul-14-2022